← The ADLC library
PD

Product & acceptance criteria

A desk of the Fastpace GroundTruth library

Done, defined precisely enough that a machine can check it.

The specification end of the life cycle: what separates a criterion from a feature name, who owns acceptance criteria once drafting is assisted, why prose is a pointer rather than a spec, and what a definition of done has to become when the builder has no judgement.

Definition of doneOpen knowledge 36 articles

Articles

  1. Specs rot faster than code Code has a compiler, a test suite and a production environment all pulling it toward truth. A specification has nothing. The difference never mattered much while humans read specs and silently corrected them. Agents read them literally. Live debates 21 Oct 2026
  2. The agent that asks a question is worth ten that do not Every vendor benchmark rewards one-shot completion, so every agent is being tuned to guess rather than ask. That is the wrong optimisation, and the questions you are suppressing are the cheapest quality signal you will ever get. Live debates 16 Oct 2026
  3. Stop writing prompts. Start writing contracts. Prompt craft is a personal skill with no owner, no version, no review and no way to check whether it worked. A contract states what must be true when the work is done, which is the only artefact that survives the run that produced it. Live debates 11 Oct 2026
  4. Your repository is the context, and it is a mess Teams argue about prompts and retrieval while the largest input to every agent run sits in git, unaudited. Your repository is a corpus of worked examples, and every abandoned pattern in it is a vote for doing the wrong thing. Live debates 6 Oct 2026
  5. Fifty percent fewer errors is a ceiling, not a floor The finding that human-refined specs cut errors by up to 50 percent is being sold as a promise. It is an upper bound under favourable conditions, and the half it does not touch is a different kind of error that no amount of specification will reach. Live debates 1 Oct 2026
  6. A spec a machine cannot check is a wish The test for an acceptance criterion is not whether a person agrees with it. It is whether anything could ever disagree with it. Most criteria fail that test, and the failure is invisible until the work comes back wrong. Live debates 26 Sept 2026
  7. Against prompt libraries Shared prompt collections look like reusable knowledge and behave like undocumented folklore. They store phrasing rather than intent, they cannot be tested, and they rot without anyone noticing. Live debates 21 Sept 2026
  8. Who writes the spec decides who runs engineering Authority in software has always sat with whoever made the last irreversible decision. That used to be the person typing. It is moving to the person who wrote the criteria, and most organisations have not noticed they are reassigning power. Live debates 16 Sept 2026
  9. The spec is the artifact of record now For thirty years the code was the only document guaranteed to be true. That guarantee rested on a fact that no longer holds, which is that a person decided every line of it and could tell you why. Live debates 11 Sept 2026
  10. Context blindness is the defining failure of 2026 Hallucination was the failure we prepared for. The one actually costing teams money is output that is internally flawless and incompatible with the repository it was written for, and no better model fixes it. Live debates 6 Sept 2026
  11. Context engineering is requirements gathering wearing a new hat The discipline is forty years old and we already know how to do it. What changed is not the skill, it is that the work moved from a phase at the start of a project to something that happens on every single ticket. Live debates 1 Sept 2026
  12. Making "done" mean something in Azure DevOps Azure DevOps can already tell you which work items went into a given deployment. Here is how to wire states, branch policies and environments so that answer is trustworthy. Field guides 31 Aug 2026
  13. Making "done" mean something in GitHub GitHub has no status called done, so teams silently adopt merged as a substitute. Here is how to build a real finish line out of required checks, linked issues and deployment records. Field guides 31 Aug 2026
  14. Making "done" mean something in Jira How to move your definition of done out of a wiki page and into the Jira workflow itself, using status categories, transition conditions and validators rather than hope. Field guides 31 Aug 2026
  15. Keeping a knowledge base true, the drift problem all over again Everything that makes a board go wrong makes a knowledge base go wrong, for the same reason. A record nobody is obliged to update is a record that will be false. Open knowledge 30 Aug 2026
  16. When to say "needs human verification" and mean it A decline is only useful if it changes what somebody does. Most teams turn theirs into a checkbox within a fortnight, and then wonder why the gate stopped catching anything. Definition of done 30 Aug 2026
  17. Verifying criteria against the diff, and its limits Reading a change and asking whether it satisfies a written criterion works better than expected, and fails in ways worth naming precisely before you rely on it. Definition of done 30 Aug 2026
  18. Runbooks, metric definitions and the shared vocabulary problem Two teams in the same company, using the same word, meaning different things. It was survivable when humans mediated. It is not survivable when agents write the query. Open knowledge 29 Aug 2026
  19. Curated context versus retrieval: when structure beats search You can index everything you already have in an afternoon. Curating a knowledge base takes months. The case for doing the slow thing is narrower than advocates claim and stronger than sceptics think. Open knowledge 29 Aug 2026
  20. The AC gate: what should block a merge A gate that blocks everything gets disabled in a fortnight. A gate that blocks nothing was never a gate. The interesting design is what happens in between. Definition of done 29 Aug 2026
  21. Who owns acceptance criteria when agents draft them A drafted checklist and an authored one look identical in the ticket. Only one of them carries a decision. That difference is an ownership problem, not a tooling one. Definition of done 29 Aug 2026
  22. Acceptance criteria as portable knowledge Most criteria die with the ticket that carried them. Treating them as concepts with a path, rather than a text field in a tracker, changes what they can do. Open knowledge 28 Aug 2026
  23. Your PRD and ERD are knowledge, not documents Planning artefacts are written once, read during kickoff, and abandoned. Most of what they contain is durable. The document format is what kills it. Open knowledge 28 Aug 2026
  24. From PRD to ERD to execution plan, mechanically Requirements, data model and work breakdown are usually three documents that drift apart. Here is what has to be true for the chain to hold without retyping. Definition of done 28 Aug 2026
  25. Remediating four thousand vague tickets You measured the backlog and it is bad. Marching through it in order is the wrong answer. Here is a triage that finishes in weeks rather than never. Definition of done 28 Aug 2026
  26. Checkbox criteria versus semantic criteria One has a state a machine can read. The other needs judgement to settle. Most teams mix them without noticing, and then wonder why automation is unreliable. Definition of done 27 Aug 2026
  27. Front matter as the agent's index The spec requires exactly one field. That restraint is a design decision worth taking seriously, and it says something about what metadata is actually for. Open knowledge 27 Aug 2026
  28. Markdown links as a knowledge graph A directory of linked markdown files is a graph nobody had to build. It is weaker than a real graph database in ways that matter, and stronger in the one way that matters most. Open knowledge 27 Aug 2026
  29. Scoring your backlog's ability to define done Before you fix anything, measure it. A concrete rubric for grading acceptance criteria at scale, and what the first run usually tells you. Definition of done 27 Aug 2026
  30. Spec-driven development is not waterfall, and the comparison is lazy Every time specification comes back into fashion, someone says waterfall. It is the fastest way to sound experienced while avoiding the actual question, which is who writes the spec and whether anything can check it. Live debates 27 Aug 2026
  31. Given/When/Then, revisited for machine readers The format was designed to get a business analyst and a developer talking. It is now being parsed by software. That changes what a good scenario looks like. Definition of done 26 Aug 2026
  32. One concept per file: the filesystem as schema The oldest data structure in computing turns out to be a decent knowledge schema, provided you accept one rule. Getting the cut right is harder than it sounds. Open knowledge 26 Aug 2026
  33. Writing acceptance criteria an agent cannot game Precise criteria are not the same as unGameable criteria. Here are the specific patterns that look rigorous, pass cleanly, and deliver nothing. Definition of done 25 Aug 2026
  34. The LLM-wiki, formalised The pattern spread as folklore before it had a specification. Now that it has one, it is worth asking what formalising a folk practice actually buys you, and what it costs. Open knowledge 25 Aug 2026
  35. What the Open Knowledge Format is, and why the ADLC needs one Google Cloud published a v0.1 spec that says knowledge is a directory of markdown files. The unglamorous part is the point, and it is exactly what agentic development has been missing. Open knowledge 25 Aug 2026
  36. Why "works correctly" is now a production incident Vague acceptance criteria used to be free, because a human filled the gap with taste. An agent fills it with the literal text, and ships that at speed. Definition of done 25 Aug 2026

The other desks